Offsite Construction Skip to main content

Offsite Construction

Offsite Project construction
Offsite Project:

The Offsite Projects are called Made in Factory Project or Prefabricated Project where the projects structural members are cast and manufactured in a factory and then transported to the site and assembled. This is like setting lego blocks that are ready-made.

Offsite Project

Why choose this method?

The factory-made or Prefabricated structural members are manufactured with machine-controlled concrete mix process and helps in reducing the waste of material which happens on-site and also the factor of safety also better in factory manufactured members.
This process showed that on-site it only has to assemble and that helps in reducing damage to the environment where the site requires an additional area where they need to mix the concrete or keep material such as steel, sand, aggregates, and more.
There are many projects which are shifted from on-site to off-site projects because they have such a good advantage and also saves time in building the project. The projects constructed by this project are more structurally sound than on-site with help of a computerized manufacturing method. Hence many projects such as stadiums, bridges, rural infra where cost is the main factor. 
Off-site Project
Recently, in covid time most of the temporary hospitals were build from prefabricated hospital wards and then assembled on site. 

This helped save life and time cost for construction.
In conclusion, we can say that:
a. Eco-friendly
b. Financial Savings
c. Flexibility In Project
d. Better & Consistent Quality
e. Reduced Site Disruption
f. Reduced Construction Time
g.Safety
This has revolutionized the way we construct houses, towers, bridges, airports, stadiums, skyscrapers, etc. 

Some Project:

De Zalmhaven One Residential Tower, Rotterdam

1. De Zalmhaven One Residential Tower, Rotterdam:

It is being built in Rotterdam, Netherlands which will be 215 meters high. the construction speed is 1 floor per week and will be the world's first tallest prefabricated skyscraper once it is completed. With this, there are other two towers which are 70 meters high.
De Zalmhaven One Residential Tower, Rotterdam
This technique was used because the site was too narrow to reach for huge machines and too crowded for such construction.

2. Puskas Arena, Budapest:

Puskas Arena, Budapest
The stadium's construction got delayed due to covid and thus offsite method is used to cast Stadium's columns, stairs, roof, and other members.

3. Avenue South Residence, Australia:

Avenue South Residence, Australia
In Western edge, these are two 56 story skyscrapers that will be built from prefabricated members. This technique came as the local government made it compulsory that offsite methods should be used as the cost of onsite are high thus reducing the price for the consumers.

4. Temburong Bridge, Brunei:

Temburong Bridge, Brunei
The Bridge was constructed using precast concrete members so as to limit the damage to the green forest.

5. Clark International Airport, Philippines:

Clark International Airport, Philippines
The new passenger airport will be constructed by prefabricated members such as floor slabs and wall elements. Also, the curved roofs are factory-made and thus easy to construct than onsite. Helped in easy construction and due to modular design, it can be easily expanded in the future.

6. Oresund Bridge, Denmark-Sweden:

Oresund Bridge, Denmark-Sweden
This was the longest prefabricated bridge for rail and road transit in Europe. The Bridge's major parts such as truss and tower components were cast on land and then shipped to the site for assembly.

Comments

Popular posts from this blog

Great Man-Made River (GMR)

Libya's Great Man Made River: The Great Man-Made River in Libya is one of the most ambitious Civil Engineering Project in history of mankind.  In the year 1953, the Libya Government found out not only vast oil reserves but also vast quantity of fresh water locked under the strata, most of the water was trapped around 7000-30000 years ago which is divided in 4 different basins. The first basin is named Kufra basin which is neat Egypt Border which covers almost 35000 sq kilometer which is quite deep around 2000 m deep. The other basin is in Sirte Basin which cover 10000 sq kilometer, third in Murzuk Basin and the last in Jabal Fezzan Basin covering 4800 sq kilometers area.  The GMR project will be used to transfer water to North of the country to provide water for irrigation purpose for more than 6 million  people. This will be a changing point  for Libya and the Colonel Muammar Gaddafi called it the Eighth Wonder of World. The work started in 1984 of the project and estimated to be

DDSS - Roof Truss

Design Of Roof Truss: If load from purlin, false ceiling etc are applied in between the nodes, then principal rafters or main ties are designed for combined stresses from bending and axial loads. IS 800 - 2007 provides general design procedure for the angle Purlins conforming to steel grade of Fe 410 of O, S, W  and not exceeding slope more than 30 degree based on live load of 750 N/m2. Loads on Trusses: Dead Load, Live Load, Wind Load and Snow Load are types of loads on the truss. The main in Design of Truss in small truss and some Industrial Truss. Dead Load (DL): If spacing of Truss is 4 m and pitch of truss is 1:4 then self weight of the truss is taken as, w = (l/3+6) of plan area .... in kN/m2. Then add all the dead loads with this such as GI sheet, AC sheet and Purlins weight. Then multiply with the plan area to get the actual DL. Live Load(LL): If the angle is less than 10 degree, then the LL will be directly taken as 750 N/m2. If slope of truss is more than 10 degree, live load

Timber Buildings !?

 Why do we need a timber building? Yes, timber buildings. As on earth human population is on an exponential rise, many and many people are trying to get home in a city where they have easy excess for the workplace for their own living. In the near future, as the population gets more concentrated in cities more and more structures I mean Tall Structures need to be built. Loading Bearing and Comparison So now architects and builders have opted for the old Technic of using timber as a building material eliminating concrete and steel. Yes, it is very hard to find this amount of trees but not impossible. It can be grown and regrown as needed. Many projects have been in progress of this idea and it reduces about 75% of carbon emission as compared to concrete and steel structure. Using timber coming directly from the forest doesn't have the appropriate strength required for a high-rise building. So designers came up with the new idea of CLT i.e. Cross Laminate Tim