Three Gorges Dam Skip to main content

Three Gorges Dam

Three Gorges Dam

As the increase in the demand for electricity in the world increases, the need to develop electricity was seen and numerous methods of producing electricity were tried. One of the most impressive methods was rotating magnet around the copper coil. This was seen to be done by the force of water dropping over a height. The process was used in many forms and this required a large amount of water and hence building a dam was needed. This is called hydroelectricity plants. 

For other types of Dam Click Here

Three Gorges Dam
As we know China has the power to build huge structures that can make the world look an ant. The need for electricity was increasing and hence they needed a huge dam that can help improve their economy. The plan of Three Gorges Dam was put forth and the work of the dam was started. The dam was to be built on the Yangtze River which is the main river of southeast China and also had many ships and cargo to pass this river.

What is unique about it?

Three Gorges Dam
31 Billion USD, 2.335 km Long, 60 Storey high (181 m), Capacity 39.3 cubic km, 32 Turbines, Produces 700 MW Power.
Three Gorges Dam
 The dam was completed in 2003 and then the number of turbines from 3 has increased to 32. But due to dam construction, the downstream farmers don't get the flood water of which the soil loses fertility and this problem was solved by providing the gates at the bottom of the dam which allows to clean out the sediments settling at the bottom.
Three Gorges Dam
As we talked about the ship movement the dam has also solved the problem of this, they have built the world's largest ship lift. There is also a ship climber that pickups the ship and then takes it up to the top and then rotates it and drops down to the reservoir. The dam also has a canal system that helps to shift many cargo ships at a time. But this canal system has a time period of 90 min whereas the shift lift takes around 30 min for passenger ships which cannot take a wait up time that long.

Comments

Popular posts from this blog

Great Man-Made River (GMR)

Libya's Great Man Made River: The Great Man-Made River in Libya is one of the most ambitious Civil Engineering Project in history of mankind.  In the year 1953, the Libya Government found out not only vast oil reserves but also vast quantity of fresh water locked under the strata, most of the water was trapped around 7000-30000 years ago which is divided in 4 different basins. The first basin is named Kufra basin which is neat Egypt Border which covers almost 35000 sq kilometer which is quite deep around 2000 m deep. The other basin is in Sirte Basin which cover 10000 sq kilometer, third in Murzuk Basin and the last in Jabal Fezzan Basin covering 4800 sq kilometers area.  The GMR project will be used to transfer water to North of the country to provide water for irrigation purpose for more than 6 million  people. This will be a changing point  for Libya and the Colonel Muammar Gaddafi called it the Eighth Wonder of World. The work started in 1984 of the project and estimated to be

Timber Buildings !?

 Why do we need a timber building? Yes, timber buildings. As on earth human population is on an exponential rise, many and many people are trying to get home in a city where they have easy excess for the workplace for their own living. In the near future, as the population gets more concentrated in cities more and more structures I mean Tall Structures need to be built. Loading Bearing and Comparison So now architects and builders have opted for the old Technic of using timber as a building material eliminating concrete and steel. Yes, it is very hard to find this amount of trees but not impossible. It can be grown and regrown as needed. Many projects have been in progress of this idea and it reduces about 75% of carbon emission as compared to concrete and steel structure. Using timber coming directly from the forest doesn't have the appropriate strength required for a high-rise building. So designers came up with the new idea of CLT i.e. Cross Laminate Tim

DDSS - Roof Truss

Design Of Roof Truss: If load from purlin, false ceiling etc are applied in between the nodes, then principal rafters or main ties are designed for combined stresses from bending and axial loads. IS 800 - 2007 provides general design procedure for the angle Purlins conforming to steel grade of Fe 410 of O, S, W  and not exceeding slope more than 30 degree based on live load of 750 N/m2. Loads on Trusses: Dead Load, Live Load, Wind Load and Snow Load are types of loads on the truss. The main in Design of Truss in small truss and some Industrial Truss. Dead Load (DL): If spacing of Truss is 4 m and pitch of truss is 1:4 then self weight of the truss is taken as, w = (l/3+6) of plan area .... in kN/m2. Then add all the dead loads with this such as GI sheet, AC sheet and Purlins weight. Then multiply with the plan area to get the actual DL. Live Load(LL): If the angle is less than 10 degree, then the LL will be directly taken as 750 N/m2. If slope of truss is more than 10 degree, live load